Following installation, the environment must remain sealed for 2 days.
The screed should be protected from direct sunlight and frost during this time. After this period good drying conditions should be maintained, increase ventilation, and if possible increase room temperature to minimise drying time.
Do not cover with polythene. Storage of materials on the screed surface, accidental exposure to water, humid or cold environments will all delay drying.
The screed should be protected from direct sunlight and frost during this time. After this period good drying conditions should be maintained, increase ventilation, and if possible increase room temperature to minimise drying time.
Do not cover with polythene. Storage of materials on the screed surface, accidental exposure to water, humid or cold environments will all delay drying.